Ghana and Cote d’Ivoire have agreed to expedite the feasibility study of a project to build and operate a thermal power plant. The plant which would be sited at the border of the two countries, would be supplied with natural gas fuel from both countries and the power produced thereof would be dispatched to Ghana and Cote d’Ivoire.
For more information, please see https://www.ghanaweb.com/GhanaHomePage/business/Ghana-Cote-d-Ivoire-agree-to-build-thermal-plant-783924
