Hon. Eng. Peter Chibwe Kapala, the Zambian Minister of Energy, stated that the conversion of the TAZAMA Pipeline from crude feedstock to refined diesel is progressing well. The TAZAMA Pipeline, which runs from Tanzania to Ndola, has a capacity of 1,100,000 tonnes annually and was constructed in 1968 to transport fuel at an affordable cost.
For more information, please see https://www.lusakatimes.com/2023/02/09/tazama-pipeline-conversion-to-refined-diesel-on-track-says-minister-of-energy/
